IFIP 18th International Conference on Product Lifecycle Management
11-14 July 2021, Curitiba, Brazil
Paper:
Digital management of large building stocks: BIM and GIS integration-based systems
References
[1] B. Kitchenham, “Procedures for Performing Systematic Reviews,” Keele, UK, Keele Univ., vol. 33, Aug. 2004.
[2] F. Beck, A. Borrmann, and T. H. Kolbe, “THE NEED for A DIFFERENTIATION between HETEROGENEOUS INFORMATION INTEGRATION APPROACHES in the FIELD of ‘BIM-GIS INTEGRATION’: A LITERATURE REVIEW,” in 3rd BIM/GIS Integration Workshop and 15th 3D GeoInfo Conference, 2020, vol. 6, no. 4/W1, pp. 21–28, doi: 10.5194/isprs-annals-VI-4-W1-2020-21-2020.
[3] D. E. Andrianesi and E. Dimopoulou, “AN INTEGRATED BIM-GIS PLATFORM for REPRESENTING and VISUALIZING 3D CADASTRAL DATA,” in 3rd BIM/GIS Integration Workshop and 15th 3D GeoInfo Conference, 2020, vol. 6, no. 4/W1, pp. 3–11, doi: 10.5194/isprs-annals-VI-4-W1-2020-3-2020.
[4] N. Arcuri, M. De Ruggiero, F. Salvo, and R. Zinno, “Automated valuation methods through the cost approach in a BIM and GIS integration framework for smart city appraisals,” Sustain., vol. 12, no. 18, 2020, doi: 10.3390/su12187546.
[5] Y. Deng, J. C. P. Cheng, and C. Anumba, “A framework for 3D traffic noise mapping using data from BIM and GIS integration,” Struct. Infrastruct. Eng., vol. 12, no. 10, pp. 1267–1280, 2016, doi: 10.1080/15732479.2015.1110603.
[6] A. A. Diakite and S. Zlatanova, “Automatic geo-referencing of BIM in GIS environments using building footprints,” Comput. Environ. Urban Syst., vol. 80, 2020, doi: 10.1016/j.compenvurbsys.2019.101453.
[7] L. Fan, S. Yamamura, and Y. Sun, “Conceptual framework for optimal urban energy planning tool with an intelligent system through integration of BIM and GIS technology,” in 33rd International on Passive and Low Energy Architecture Conference: Design to Thrive, PLEA 2017, 2017, vol. 1, pp. 1400–1407, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85053120008&partnerID=40&md5=b55e92d599a6e0b45a26c568b7036199.
[8] A. E. H. Hor, G. Sohn, P. Claudio, M. Jadidi, and A. Afnan, “A semantic graph database for BIM-GIS integrated information model for an intelligent urban mobility web application,” in ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences, 2018, vol. 4, no. 4, pp. 89–96, doi: 10.5194/isprs-annals-IV-4-89-2018.
[9] W. Lu, Y. Peng, F. Xue, K. Chen, Y. Niu, and X. Chen, “The Fusion of GIS and Building Information Modeling for Big Data Analytics in Managing Development Sites,” in Comprehensive Geographic Information Systems, vol. 3, The University of Hong Kong, Pokfulam, Hong Kong: Elsevier Inc., 2017, pp. 345–359.
[10] K. McGlinn et al., “Publishing authoritative geospatial data to support interlinking of building information models,” Autom. Constr., vol. 124, 2021, doi: 10.1016/j.autcon.2020.103534.
[11] K. McGlinn, C. Debruyne, L. McNerney, and D. O’Sullivan, “Integrating building information models with authoritative Irish geospatial information,” in 2017 ISWC Posters and Demonstrations and Industry Tracks, ISWC-P and D-Industry 2017, 2017, vol. 1963, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85033468242&partnerID=40&md5=73c8af167d9ea4d47f8fbedfa4e9a394.
[12] M. K. McGlinn, C. Debruyne, L. McNerney, and D. O’Sullivan, “Integrating Ireland’s Geospatial Information to Provide Authoritative Building Information,” in ACM International Conference Proceeding Series, 2017, vol. 2017-Septe, pp. 57–64, doi: 10.1145/3132218.3132223.
[13] A. Mercer, “Smart cities need smart ways of working,” GEO Connex., vol. 15, no. 9, pp. 44–45, 2016, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84994475224&partnerID=40&md5=23707e259b2f1d76f9d8c984573e24b8.
[14] N. O. Nawari and S. Ravindran, Blockchain and Building Information Modeling (BIM): Review and applications in post-disaster recovery, vol. 9, no. 6. 2019.
[15] A.-C. Badea, G. Badea, D. Vasilca, A. Iliescu-Cremeneanu, and D. Badea, “Bim, gis and cad(Astre) under the current challenges,” in 18th International Multidisciplinary Scientific Geoconference, SGEM 2018, 2018, vol. 18, no. 2.3, pp. 329–336, doi: 10.5593/sgem2018/2.3/S11.042.
[16] F. Noardo, T. Wu, K. Arroyo Ohori, T. Krijnen, H. Tezerdi, and J. Stoter, “Geobim for digital building permit process: Learning from a case study in Rotterdam,” in 3rd BIM/GIS Integration Workshop and 15th 3D GeoInfo Conference, 2020, vol. 6, no. 4/W1, pp. 151–158, doi: 10.5194/isprs-annals-VI-4-W1-2020-151-2020.
[17] S. Park and C. Hong, “Roles and scope of system interface in integrated control system for multi disaster countermeasure,” Int. J. Saf. Secur. Eng., vol. 7, no. 3, pp. 361–366, 2017, doi: 10.2495/SAFE-V7-N3-361-366.
[18] R. Ramírez Eudave and T. M. Ferreira, “On the suitability of a unified GIS-BIM-HBIM framework for cataloguing and assessing vulnerability in Historic Urban Landscapes: a critical review,” Int. J. Geogr. Inf. Sci., 2020, doi: 10.1080/13658816.2020.1844208.
[19] A. Redmond, B. Fies, and A. Zarli, “Developing an integrated cloud platform for enabling ‘holistic energy management’ in urban areas,” eWork Ebus. Archit. Eng. Constr. - Proc. 10th Eur. Conf. Prod. Process Model. ECPPM 2014, no. April 2017, pp. 409–416, 2015, doi: 10.1201/b17396-69.
[20] S. Saran et al., “Utilities of Virtual 3D City Models Based on CityGML: Various Use Cases,” J. Indian Soc. Remote Sens., vol. 46, no. 6, pp. 957–972, 2018, doi: 10.1007/s12524-018-0755-5.
[21] K. Shahi, B. Y. McCabe, and A. Shahi, “Framework for Automated Model-Based e-Permitting System for Municipal Jurisdictions,” J. Manag. Eng., vol. 35, no. 6, 2019, doi: 10.1061/(ASCE)ME.1943-5479.0000712.
[22] I. Shahrour, L. Alileche, and A. Alfurjani, “Smart cities: System and tools used for the digital modelling of physical urban systems,” in 1st International Conference on Sensors Networks Smart and Emerging Technologies, SENSET 2017, 2017, vol. 2017-Janua, pp. 1–4, doi: 10.1109/SENSET.2017.8125056.
[23] J. Sun, P. Olsson, H. Eriksson, and L. Harrie, “Evaluating the geometric aspects of integrating BIM data into city models,” J. Spat. Sci., vol. 65, no. 2, pp. 235–255, 2020, doi: 10.1080/14498596.2019.1636722.
[24] H. Wang, Y. Pan, and X. Luo, “Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis,” Autom. Constr., vol. 103, pp. 41–52, 2019, doi: 10.1016/j.autcon.2019.03.005.
[25] S. Yamamura, L. Fan, and Y. Suzuki, “A Proposal of comprehensive urban infrastructure planning model for smart city planning with GIS and 3D modelling - Case study in urban area of Tokyo,” in 33rd International on Passive and Low Energy Architecture Conference: Design to Thrive, PLEA 2017, 2017, vol. 1, pp. 1462–1469, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85085955900&partnerID=40&md5=82c25f3d0912ceed918fd839c2f9e20b.
[26] Y. Bai, P. A. Zadeh, S. Staub-French, and R. Pottinger, “Integrating GIS and BIM for community-scale energy modeling,” in International Conference on Sustainable Infrastructure 2017: Methodology - Proceedings of the International Conference on Sustainable Infrastructure 2017, 2017, pp. 185–196, doi: 10.1061/9780784481196.017.
[27] S. Yamamura, L. Fan, and Y. Suzuki, “Assessment of Urban Energy Performance through Integration of BIM and GIS for Smart City Planning,” Procedia Eng., vol. 180, pp. 1462–1472, 2017, doi: 10.1016/j.proeng.2017.04.309.
[28] C. M. O. Yosino and S. L. Ferreira, “Using BIM and GIS Interoperability to Create CIM Model for USW Collection Analysis,” Lecture Notes in Civil Engineering, vol. 98. Springer, University of São Paulo, São Paulo, SP, Brazil, pp. 248–271, 2021, doi: 10.1007/978-3-030-51295-8_19.
[29] P. A. Zadeh, L. Wei, A. Dee, R. Pottinger, and S. Staub-French, “BIM-CityGML data integration for modern urban challenges,” J. Inf. Technol. Constr., vol. 24, pp. 318–340, 2019, doi: 10.36680/j.itcon.2019.017.
[30] L. Barazzetti, “Integrated BIM-GIS model generation at the city scale using geospatial data,” in 6th International Conference on Remote Sensing and Geoinformation of the Environment, RSCy 2018, 2018, vol. 10773, doi: 10.1117/12.2324646.
[31] M. Breunig et al., “Collaborative multi-scale 3D city and infrastructure modeling and simulation,” in Tehran’s Joint ISPRS International Conferences of the 2nd Geospatial Information Research, GI Research 2017, the 4th Sensors and Models in Photogrammetry and Remote Sensing, SMPR 2017 and the 6th Earth Observation of Environmental Changes, EOEC 2017, 2017, vol. 42, no. 4W4, pp. 341–352, doi: 10.5194/isprs-archives-XLII-4-W4-341-2017.
[32] A. Chenaux et al., “A REVIEW of 3D GIS for USE in CREATING VIRTUAL HISTORIC DUBLIN,” in 8th International Workshop on 3D Virtual Reconstruction and Visualization of Complex Architectures, 3D-ARCH 2019, 2019, vol. 42, no. 2/W9, pp. 249–254, doi: 10.5194/isprs-archives-XLII-2-W9-249-2019.
[33] G. Costa, Á. Sicilia, G. N. Lilis, D. V Rovas, and J. Izkara, “A comprehensive ontologies-based framework to support the retrofitting design of energy-efficient districts,” in eWork and eBusiness in Architecture, Engineering and Construction - Proceedings of the 11th European Conference on Product and Process Modelling, ECPPM 2016, 2016, pp. 673–681, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85016631400&partnerID=40&md5=d82deb9d85daaf8b8c039585dc797ad0.
[34] N. Dawood, H. Dawood, S. Rodriguez-Trejo, and M. Crilly, “Visualising urban energy use: the use of LiDAR and remote sensing data in urban energy planning,” Vis. Eng., vol. 5, no. 1, 2017, doi: 10.1186/s40327-017-0060-3.
[35] T. Delval et al., “BIM to Develop Integrated, Incremental and Multiscale Methods to Assess Comfort and Quality of Public Spaces,” Lecture Notes in Civil Engineering, vol. 98. Springer, Centre Scientifique et Technique du Bâtiment, 84 Avenue Jean Jaurès, Champs sur Marne, 77420, France, pp. 160–179, 2021, doi: 10.1007/978-3-030-51295-8_14.
[36] S. G. Abramyan and O. V Oganesyan, “Impact of earthworks on the atmosphere during the reconstruction and overhaul of trunk pipelines,” in 2020 International Conference on Construction, Architecture and Technosphere Safety, ICCATS 2020, 2020, vol. 962, no. 4, doi: 10.1088/1757-899X/962/4/042057.
[37] J. Carneiro, R. J. F. Rossetti, D. C. Silva, and E. C. Oliveira, “BIM, GIS, IoT, and AR/VR Integration for Smart Maintenance and Management of Road Networks: A Review,” in 2018 IEEE International Smart Cities Conference, ISC2 2018, 2019, doi: 10.1109/ISC2.2018.8656978.
[38] G. S. Floros, P. Ruff, and C. Ellul, “IMPACT of INFORMATION MANAGEMENT during DESIGN &CONSTRUCTION on DOWNSTREAM BIM-GIS INTEROPERABILITY for RAIL INFRASTRUCTURE,” in 3rd BIM/GIS Integration Workshop and 15th 3D GeoInfo Conference, 2020, vol. 6, no. 4/W1, pp. 61–68, doi: 10.5194/isprs-annals-VI-4-W1-2020-61-2020.
[39] M. Garramone, N. Moretti, M. Scaioni, C. Ellul, F. Re Cecconi, and M. C. Dejaco, “BIM and GIS INTEGRATION for INFRASTRUCTURE ASSET MANAGEMENT: A BIBLIOMETRIC ANALYSIS,” in 3rd BIM/GIS Integration Workshop and 15th 3D GeoInfo Conference, 2020, vol. 6, no. 4/W1, pp. 77–84, doi: 10.5194/isprs-annals-VI-4-W1-2020-77-2020.
[40] T. Gilbert, S. Barr, P. James, J. Morley, and Q. Ji, “Software systems approach to multi-scale GIS-BIM utility infrastructure network integration and resource flow simulation,” ISPRS Int. J. Geo-Information, vol. 7, no. 8, 2018, doi: 10.3390/ijgi7080310.
[41] M. Q. Huang, J. Ninić, and Q. B. Zhang, “BIM, machine learning and computer vision techniques in underground construction: Current status and future perspectives,” Tunn. Undergr. Sp. Technol., vol. 108, 2021, doi: 10.1016/j.tust.2020.103677.
[42] X. Kang, “Preliminary Exploration on the Intelligent Construction and Operation of China’s High-speed Railway ,” J. Railw. Eng. Soc., vol. 36, no. 4, pp. 84–89, 2019, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85073657933&partnerID=40&md5=b2f2a4a7dc21f814effdbda0ed747f4e.
[43] H. Kim, Z. Chen, C.-S. Cho, H. Moon, K. Ju, and W. Choi, “Integration of BIM and GIS: Highway cut and fill earthwork balancing,” in 2015 ASCE International Workshop on Computing in Civil Engineering, IWCCE 2015, 2015, vol. 2015-Janua, no. January, pp. 468–474, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84936882236&partnerID=40&md5=2982b1ac1136423414c36081592e48fc.
[44] S. Kurwi, P. Demian, and T. M. Hassan, “Integrating BIM and GIS in railway projects: A critical review,” Assoc. Res. Constr. Manag. ARCOM - 33rd Annu. Conf. 2017, Proceeding, pp. 45–53, 2017.
[45] H.-M. Lyu, S.-L. Shen, A. Zhou, and J. Yang, “Perspectives for flood risk assessment and management for mega-city metro system,” Tunn. Undergr. Sp. Technol., vol. 84, pp. 31–44, 2019, doi: 10.1016/j.tust.2018.10.019.
[46] S. Mao, J.-L. Lebrun, O. Doukari, R. Aguejdad, and Y. Yuan, “3D BIM multi-scale modeling for a tunnel construction project ,” in 11th Annual International Conference on Spatial Analysis and GEOmatics, SAGEO 2015, 2015, vol. 1535, pp. 135–149, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84962227773&partnerID=40&md5=9c3d4995a47b231c5b3638ceed4b629a.
[47] M. Marzouk and A. Othman, “Planning utility infrastructure requirements for smart cities using the integration between BIM and GIS,” Sustain. Cities Soc., vol. 57, 2020, doi: 10.1016/j.scs.2020.102120.
[48] A. Carstens, “BIM & GIS – New dimensions of improved collaboration for infrastructure and environment,” J. Digit. Landsc. Archit., vol. 2019, no. 4, pp. 114–121, 2019, doi: 10.14627/537663012.
[49] H. Sofia, E. Anas, and O. Faiz, “Mobile mapping, machine learning and digital twin for road infrastructure monitoring and maintenance: Case study of mohammed VI bridge in Morocco,” in 2nd IEEE International Conference of Moroccan Geomatics, MORGEO 2020, 2020, doi: 10.1109/Morgeo49228.2020.9121882.
[50] M. Wang, Y. Deng, J. Won, and J. C. P. Cheng, “An integrated underground utility management and decision support based on BIM and GIS,” Autom. Constr., vol. 107, 2019, doi: 10.1016/j.autcon.2019.102931.
[51] W. Yuan, Z. Xiong, J. Chu, and H. Lu, “Asset Management Information System of Nanjing Subway Operation Based on BIM ,” Mod. Tunn. Technol., vol. 56, no. 2, pp. 30–39, 2019, doi: 10.13807/j.cnki.mtt.2019.02.005.
[52] G.-Z. Zhang, “Research and Application of BIM Construction Management Platform for Hutong Changjiang River Bridge,” Bridg. Constr., vol. 48, no. 5, pp. 6–10, 2018, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85062943505&partnerID=40&md5=ebbe4c7c3da41c967da744e9b9acf168.
[53] S. Zhang, D. Hou, C. Wang, F. Pan, and L. Yan, “Integrating and managing BIM in 3D web-based GIS for hydraulic and hydropower engineering projects,” Autom. Constr., vol. 112, 2020, doi: 10.1016/j.autcon.2020.103114.
[54] Y. Zhang, C. Huang, and C. Zhu, “Research on the Application of Railway Engineering Project Management System Based on BIM ,” J. Railw. Eng. Soc., vol. 36, no. 9, pp. 98–103, 2019, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85075183679&partnerID=40&md5=f2a82bea3ad6cb4d68abe21998cbe5d8.
[55] L. Zhao, Z. Liu, and J. Mbachu, “Highway alignment optimization: An integrated BIM and GIS approach,” ISPRS Int. J. Geo-Information, vol. 8, no. 4, 2019, doi: 10.3390/ijgi8040172.
[56] Q. Zhao, C. He, S. Yang, T. Fang, and S. Zhu, “Transformation of Underground Space Models Based on IFC and CityGML-A Case Study of Utility Tunnel ,” Wuhan Daxue Xuebao (Xinxi Kexue Ban)/Geomatics Inf. Sci. Wuhan Univ., vol. 45, no. 7, pp. 1058–1064, 2020, doi: 10.13203/j.whugis20180409.
[57] W. Zheng, X. Zhou, H. Wu, H. Li, X. Zhu, and L. Wen, “Digital twin system for highway traffic based on 3D GIS technology ,” Jisuanji Jicheng Zhizao Xitong/Computer Integr. Manuf. Syst. CIMS, vol. 26, no. 1, pp. 28–39, 2020, doi: 10.13196/j.cims.2020.01.003.
[58] H. Zhu, X. Li, and X. Lin, “Infrastructure Smart Service System (iS3) and its application,” Tumu Gongcheng Xuebao/China Civ. Eng. J., vol. 51, no. 1, pp. 1–12, 2018, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85048930218&partnerID=40&md5=9a3c6da1e202edd4130795f246f24ea7.
[59] J. C. P. Cheng and Y. Deng, “An integrated BIM-GIS framework for utility information management and analyses,” in 2015 ASCE International Workshop on Computing in Civil Engineering, IWCCE 2015, 2015, vol. 2015-Janua, no. January, pp. 667–674, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84936852218&partnerID=40&md5=baac2f47577e05002cc57633c705b7f1.
[60] J. Zhu, Y. Tan, X. Wang, and P. Wu, “BIM/GIS integration for web GIS-based bridge management,” Ann. GIS, 2020, doi: 10.1080/19475683.2020.1743355.
[61] M. Corongiu, G. Tucci, E. Santoro, and O. Kourounioti, “Data integration of different domains in geo-information management: A railway infrastructure case study,” in ISPRS TC IV Mid-Term Symposium on 3D Spatial Information Science - The Engine of Change, 2018, vol. 42, no. 4, pp. 193–200, doi: 10.5194/isprs-archives-XLII-4-121-2018.
[62] F. D’Amico, A. Calvi, E. Schiattarella, M. D. Prete, and V. Veraldi, “BIM and GIS Data Integration: A Novel Approach of Technical/Environmental Decision-Making Process in Transport Infrastructure Design,” in 2019 Transport Infrastructure and Systems in a Changing World. Towards a more Sustainable, Reliable and Smarter Mobility, TIS Roma 2019, 2020, vol. 45, pp. 803–810, doi: 10.1016/j.trpro.2020.02.090.
[63] L. L. Dong, J. Wu, W. Wang, and Y. B. Xie, “Full lifecycle digital control of urban rail transit property based on the integration between CAD, GIS and BIM,” Adv. Transp. Stud., vol. 2, no. Special Issue, pp. 15–26, 2019, doi: 10.4399/97888255305512.
[64] L. Dong, J. Wu, W. Wang, and Y. Zhou, “Visualization of foundation evaluation for urban rail transit based on CGB technology integration,” Int. J. Sustain. Dev. Plan., vol. 15, no. 4, pp. 477–486, 2020, doi: 10.18280/ijsdp.150408.
[65] D.-K. Fan, “Research on the fusion technology of BIM and GIS applied in railway information deployment,” J. Railw. Eng. Soc., vol. 33, no. 10, pp. 106–110 and 128, 2016, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84996772869&partnerID=40&md5=322824e3d145f1808df2a0057551cb74.
[66] J. Farooq, P. Sharma, and R. Sreerama Kumar, “Applications of building information modeling in electrical systems design,” J. Eng. Sci. Technol. Rev., vol. 10, no. 6, pp. 119–128, 2017, doi: 10.25103/jestr.106.16.
[67] S. Amirebrahimi, A. Rajabifard, P. Mendis, and T. Ngo, “A BIM-GIS integration method in support of the assessment and 3D visualisation of flood damage to a building,” J. Spat. Sci., vol. 61, no. 2, pp. 317–350, 2016, doi: 10.1080/14498596.2016.1189365.
[68] S. Amirebrahimi, A. Rajabifard, P. Mendis, and T. Ngo, “A framework for a microscale flood damage assessment and visualization for a building using BIM–GIS integration,” Int. J. Digit. Earth, vol. 9, no. 4, pp. 363–386, 2016, doi: 10.1080/17538947.2015.1034201.
[69] Y. Deng, V. J. L. Gan, M. Das, J. C. P. Cheng, and C. Anumba, “Integrating 4D BIM and GIS for Construction Supply Chain Management,” J. Constr. Eng. Manag., vol. 145, no. 4, 2019, doi: 10.1061/(ASCE)CO.1943-7862.0001633.
[70] F. Dutt, S. J. Quan, E. Woodworth, D. Castro-Lacouture, B. J. Stuart, and P. P.-J. Yang, “Modeling algae powered neighborhood through GIS and BIM integration,” in 8th International Conference on Applied Energy, ICAE 2016, 2017, vol. 105, pp. 3830–3836, doi: 10.1016/j.egypro.2017.03.896.
[71] C. Ellul, G. Boyes, C. Thomson, and D. Backes, “Towards integrating BIM and GIS—an end-to-end example from point cloud to analysis,” Lecture Notes in Geoinformation and Cartography, no. 9783319256894. Springer Berlin Heidelberg, Department of Civil, Environmental and Civil Engineering, University College London, London, WC1E 6BT, United Kingdom, pp. 495–512, 2017, doi: 10.1007/978-3-319-25691-7_28.
[72] K. Farghaly, H. Abanda, C. Vidalakis, and G. Wood, “BIM for asset management: A taxonomy of non-geometric BIM data for asset management,” in 24th EG-ICE International Workshop on Intelligent Computing in Engineering 2017, 2017, pp. 96–105, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85026801747&partnerID=40&md5=c221361152828a8892fac974fb9c119d.
[73] M. Gunduz, U. Isikdag, and M. Basaraner, “INTEGRATION of BIM, WEB MAPS and IOT for SUPPORTING COMFORT ANALYSIS,” ISPRS Ann. Photogramm. Remote Sens. Spat. Inf. Sci., vol. 4, no. 4W4, pp. 221–227, 2017, doi: 10.5194/isprs-annals-IV-4-W4-221-2017.
[74] W. Li, S. Zlatanova, A. A. Diakite, M. Aleksandrov, and J. Yan, “Towards integrating heterogeneous data: A spatial DBMS solution from a CRC-LCL project in Australia,” ISPRS Int. J. Geo-Information, vol. 9, no. 2, 2020, doi: 10.3390/ijgi9020063.
[75] T.-Y. Lin, H.-Y. Shih, J.-C. Huang, Y.-L. Hou, Y. Y. Chiu, and Y.-X. Lin, “Study on the dormitory public facilities management using BIM,” in 2018 IEEE International Conference on Advanced Manufacturing, ICAM 2018, 2019, pp. 191–193, doi: 10.1109/AMCON.2018.8614813.
[76] E. J. Mascort-Albea, A. Jaramillo-Morilla, R. Romero-Hernández, and F. M. Hidalgo-Sánchez, “BIM-GIS interoperability applied to architectonic heritage: 2D and 3D digital models for the study of the ancient church of santa lucía in seville (Spain),” in 4th International Congress Science and Technology for the Conservation of Cultural Heritage, TECHNOHERITAGE 2019, 2020, pp. 31–35, doi: 10.1201/9780429345470-5.
[77] F. Matrone, E. Colucci, V. De Ruvo, A. Lingua, and A. Spanò, “HBIM in a semantic 3d gis database,” in 2nd International Conference of Geomatics and Restoration, GEORES 2019, 2019, vol. 42, no. 2/W11, pp. 857–865, doi: 10.5194/isprs-Archives-XLII-2-W11-857-2019.
[78] C. Mirarchi, A. Pavan, F. de Marco, X. Wang, and Y. Song, “Supporting facility management processes through end-users’ Integration and coordinated BIM-GIS technologies,” ISPRS Int. J. Geo-Information, vol. 7, no. 5, 2018, doi: 10.3390/IJGI7050191.
[79] S. Amirebrahimi, A. Rajabifard, P. Mendis, and T. Ngo, “A data model for integrating GIS and BIM for assessment and 3D visualisation of flood damage to building,” in CEUR Workshop Proceedings, 2015, vol. 1323, pp. 78–89, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-84925114451&partnerID=40&md5=d9e8480f9f78906b1df25173faec30ef.
[80] D. Navas-Carrillo, J. C. Gómez de Cózar, and M. T. Pérez Cano, “Geographic information systems (GIS) and building information modeling (BIM): Tools for assessing the cultural values of mass housing neighbourhoods in medium-sized cities of andalusia,” in 4th International Congress Science and Technology for the Conservation of Cultural Heritage, TECHNOHERITAGE 2019, 2020, pp. 104–108, doi: 10.1201/9780429345470-19.
[81] F. Rechichi, “Chimera: A BIM+GIS system for cultural heritage,” in 2020 24th ISPRS Congress - Technical Commission IV on Spatial Information Science, 2020, vol. 43, no. B4, pp. 493–500, doi: 10.5194/isprs-archives-XLIII-B4-2020-493-2020.
[82] M. Saccucci and A. Pelliccio, “Integrated BIM-GIS system for the enhancement of urban heritage,” in 2018 IEEE International Conference on Metrology for Archaeology and Cultural Heritage, MetroArchaeo 2018, 2018, pp. 222–226, doi: 10.1109/MetroArchaeo43810.2018.13625.
[83] A. Scianna and M. La Guardia, “Main features of a 3d gis for a monumental complex with an historical-cultural relevance,” in 1st International Conference on Geomatics and Restoration: Conservation of Cultural Heritage in the Digital Era, GeoRes 2017, 2017, vol. 42, no. 5W1, pp. 519–526, doi: 10.5194/isprs-Archives-XLII-5-W1-519-2017.
[84] S. A. F. Syed Abdul Rahman and K. N. Abdul Maulud, “Approaching BIM-GIS Integration for 3D Evacuation Planning Requirement Using Multipatch Geometry Data Format,” in 4th International Conference on Research Methodology for Built Environment and Engineering 2019, ICRMBEE 2019, 2019, vol. 385, no. 1, doi: 10.1088/1755-1315/385/1/012033.
[85] S. N. A. Syed Mustorpha and W. M. N. Wan Mohd, “A BIM ORIENTED MODEL to A 3D INDOOR GIS for SPACE MANAGEMENT-A REQUIREMENT ANALYSIS,” in 4th International Conference on Research Methodology for Built Environment and Engineering 2019, ICRMBEE 2019, 2019, vol. 385, no. 1, doi: 10.1088/1755-1315/385/1/012046.
[86] T.-A. Teo and K.-H. Cho, “BIM-oriented indoor network model for indoor and outdoor combined route planning,” Adv. Eng. Informatics, vol. 30, no. 3, pp. 268–282, 2016, doi: 10.1016/j.aei.2016.04.007.
[87] T. Tomchinskaya and M. Galanina, “University management system based on bim-gis-technologies,” in 30th International Conference on Computer Graphics and Machine Vision, GraphiCon 2020, 2020, vol. 2744, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85098157474&partnerID=40&md5=f44d65147e7458164eaf85a89d2c8df4.
[88] C.-F. Tsai, Y.-T. Xiao, H.-S. Chen, Y.-X. Ye, C.-H. Wang, and T.-W. Liang, “Integration of BIM & GIS to query management on pipeline of building-A case study of dormitory,” in 2017 IEEE International Conference on Applied System Innovation, ICASI 2017, 2017, pp. 944–947, doi: 10.1109/ICASI.2017.7988597.
[89] E. Tsilimantou, E. T. Delegou, I. A. Nikitakos, C. Ioannidis, and A. Moropoulou, “GIS and BIM as integrated digital environments for modeling and monitoring of historic buildings,” Appl. Sci., vol. 10, no. 3, 2020, doi: 10.3390/app10031078.
[90] S. Atyabi, M. Kiavarz Moghaddam, and A. Rajabifard, “Optimization of emergency evacuation in fire building by integrated bim and gis,” in ISPRS International GeoSpatial Conference 2019, Joint Conferences of 5th Sensors and Models in Photogrammetry and Remote Sensing, SMPR 2019 and 3rd Geospatial Information Research, GI Research 2019, 2019, vol. 42, no. 4/W18, pp. 131–139, doi: 10.5194/isprs-archives-XLII-4-W18-131-2019.
[91] G. Vacca, E. Quaquero, D. Pili, and M. Brandolini, “GIS-HBIM integration for the management of historical buildings,” in 2018 ISPRS TC II Mid-term Symposium “‘Towards Photogrammetry 2020,’” 2018, vol. 42, no. 2, pp. 1129–1135, doi: 10.5194/isprs-archives-XLII-2-1129-2018.
[92] T. Wang, T. Krijnen, and B. De Vries, “Combining GIS and BIM for facility reuse: A profiling approach,” Research in Urbanism Series, vol. 4, no. 1. TU Delft, pp. 185–203, 2016, doi: 10.7480/rius.4.824.
[93] T. K. Wang, Q. Zhang, H. Y. Chong, and X. Wang, “Integrated supplier selection framework in a resilient construction supply chain: An approach via analytic hierarchy process (AHP) and grey relational analysis (GRA),” Sustain., vol. 9, no. 2, 2017, doi: 10.3390/su9020289.
[94] J. K. W. Wong, J. Ge, and S. X. He, “Digitisation in facilities management: A literature review and future research directions,” Autom. Constr., vol. 92, no. October 2017, pp. 312–326, 2018, doi: 10.1016/j.autcon.2018.04.006.
[95] B. Wu and S. Zhang, “Integration of GIS And BIM for indoor geovisual analytics,” in 23rd International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences Congress, ISPRS 2016, 2016, vol. 41, pp. 455–458, doi: 10.5194/isprsarchives-XLI-B2-455-2016.
[96] X. Yang, P. Grussenmeyer, M. Koehl, H. Macher, A. Murtiyoso, and T. Landes, “Review of built heritage modelling: Integration of HBIM and other information techniques,” J. Cult. Herit., 2020, doi: 10.1016/j.culher.2020.05.008.
[97] A. Baik, R. Yaagoubi, and J. Boehm, “Integration of jeddah historical bim and 3D GIS for documentation and restoration of historical monument,” in 25th ISPRS International CIPA Symposium 2015, 2015, vol. 40, no. 5W7, pp. 29–34, doi: 10.5194/isprsarchives-XL-5-W7-29-2015.
[98] H. Bayat, M. R. Delavar, W. Barghi, S. A. Eslaminezhad, P. Hanachi, and S. Zlatanova, “Modeling of emergency evacuation in building fire,” in 2020 24th ISPRS Congress - Technical Commission IV on Spatial Information Science, 2020, vol. 43, no. B4, pp. 321–328, doi: 10.5194/isprs-archives-XLIII-B4-2020-321-2020.
[99] L. Bottaccioli et al., “Building Energy Modelling and Monitoring by Integration of IoT Devices and Building Information Models,” in 41st IEEE Annual Computer Software and Applications Conference, COMPSAC 2017, 2017, vol. 1, pp. 914–922, doi: 10.1109/COMPSAC.2017.75.
[100] G. A. Boyes, C. Ellul, and D. Irwin, “EXPLORING BIM for OPERATIONAL INTEGRATED ASSET MANAGEMENT – A PRELIMINARY STUDY UTILISING REAL-WORLD INFRASTRUCTURE DATA,” in 12th 3D Geoinfo Conference 2017, 2017, vol. 4, no. 4W5, pp. 49–56, doi: 10.5194/isprs-annals-IV-4-W5-49-2017.
[101] N. Bruno, F. Rechichi, C. Achille, A. Zerbi, R. Roncella, and F. Fassi, “Integration of historical GIS data in a HBIM system,” in 2020 24th ISPRS Congress - Technical Commission IV on Spatial Information Science, 2020, vol. 43, no. B4, pp. 427–434, doi: 10.5194/isprs-archives-XLIII-B4-2020-427-2020.
[102] C. Cecchini, A. Magrini, and M. Morandotti, “The energy-oriented management of public historic buildings: An integrated approach and methodology applications,” Sustain., vol. 12, no. 11, 2020, doi: 10.3390/su12114576.
[103] X. Ding, J. Yang, L. Liu, W. Huang, and P. Wu, “Integrating IFC and CityGML model at schema level by using linguistic and text mining techniques,” IEEE Access, vol. 8, pp. 56429–56440, 2020, doi: 10.1109/ACCESS.2020.2982044.
[104] M. J. Sani, I. A. Musliman, and A. Abdul Rahman, “EXTRACTION and TRANSFORMATION of IFC DATA to CITYGML FORMAT,” in 6th International Conference on Geomatics and Geospatial Technology, GGT 2019, 2019, vol. 42, no. 4/W16, pp. 595–601, doi: 10.5194/isprs-archives-XLII-4-W16-595-2019.
[105] H. Tauscher, J. Lim, and R. Stouffs, “A modular graph transformation rule set for IFC-to-CityGML conversion,” Trans. GIS, 2021, doi: 10.1111/tgis.12723.
[106] N. Wang and R. R. A. Issa, “Ontology-Based Integration of BIM and GIS for Indoor Routing,” in Construction Research Congress 2020: Computer Applications, 2020, pp. 1010–1019, [Online]. Available: https://www.scopus.com/inward/record.uri?eid=2-s2.0-85096758553&partnerID=40&md5=6252ce45ea5a010be73336c8b97537ea.
[107] A. U. Usmani, M. Jadidi, and G. Sohn, “Automatic ontology generation of BIM and GIS data,” in 2020 24th ISPRS Congress - Technical Commission IV on Spatial Information Science, 2020, vol. 43, no. B4, pp. 77–80, doi: 10.5194/isprs-archives-XLIII-B4-2020-77-2020.
[108] BuildingSMART, “Calls for Participation,” 2019. https://www.buildingsmart.org/standards/calls-for-participation/.
[109] M. Murphy, E. Mcgovern, and S. Pavia, “Historic building information modelling (HBIM),” Struct. Surv., vol. 27, no. 4, pp. 311–327, 2009, doi: 10.1108/02630800910985108.
[110] G. Vacca, E. Quaquero, D. Pili, and M. Brandolini, “Integrating bim and gis data to support the management of large building stocks,” in International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives, 2018, vol. 42, no. 4, pp. 717–724, doi: 10.5194/isprs-archives-XLII-4-647-2018.
[111] E. S. Malinverni, B. Naticchia, J. L. Lerma Garcia, A. Gorreja, J. Lopez Uriarte, and F. Di Stefano, “A semantic graph database for the interoperability of 3D GIS data,” Appl. Geomatics, 2020, doi: 10.1007/s12518-020-00334-3.